Project scope consisted of miscellaneous site improvements including grading and asphalt pavement drives along with demolition of existing aerobic sludge digester blowers, piping, and valves. New installations included new cast-in-place blower pads and installation of four (4) new blowers, stainless steel air piping, and miscellaneous instrumentation/appurtenances. Work also included the addition of a new Chemical Feed Station at the Clarifier Splitter Box. Electrical and controls improvements included new Blower VFDs, power distribution equipment, Programable Logic Controllers, and SCADA integration of the new systems.