Project scope consisted of miscellaneous site improvements including grading and asphalt pavement drives along with demolition of existing aerobic sludge digester blowers, piping, and valves.  New installations included new cast-in-place blower pads and installation of four (4) new blowers, stainless steel air piping, and miscellaneous instrumentation/appurtenances.  Work also included the addition of a new Chemical Feed Station at the Clarifier Splitter Box.  Electrical and controls improvements included new Blower VFDs, power distribution equipment, Programable Logic Controllers, and SCADA integration of the new systems.

Completed April 2023.