LFUCG HARTLAND
LEXINGTON, KENTUCKY
Project scope consisted of excavation, rock removal, and installation of new 10’ diameter precast wet well structures along with installation of connecting manholes, precast valve vault, piping, valves, and installation and start-up of comminutor equipment and submersible pumps. Construction also included demolition of the existing pumping station, piping tie-ins under flow conditions, asphalt paving, and perimeter fencing. Electrical revisions included a new utility service, quick-connect generator transfer switch, pump and comminutor controls, and telemetry improvements.
Completed October 2022.